EDS Active Kits
The First Line Technology Enhanced Decon Systems (EDS) are the only rapid deployment Hybrid Decon go-bags with the power of Dahlgren Decon and FiberTect. The EDS has the power to decon 6, 12, or 24 personnel (depending on configuration chosen) with everything needed for fast and effective Hybrid Decontamination™ of hundreds of known and emerging threats. The EDS can be carried easily and can be quickly deployed, even in extreme temperature conditions where most other decontamination solutions are unusable. The EDS can be made fully operational by one person in only a few minutes and does not require any source of water or power. The system requires only two personnel to operate and contains everything needed to complete full technical decontamination from tool drop to waste disposal. After deployment, replenishment items can be purchased as needed without having to purchase an entire kit.
EDS Training Kits
EDS Training Kits contain inert versions of Dahlgren Decon and FiberTect that accurately replicate the look, feel, and smell of the real world solution for realistic training.
EDS Active and Inert (Training) Kits are available in three (3) Sizes – EDS6, EDS12, EDS24
Name of Product |
Formula |
Serves # of People |
Item # |
First Line Technology Enhanced Decon Systems (EDS6) |
Active |
For up to 6 people |
FLT-FLT-EDS-6-S |
First Line Technology Enhanced Decon Systems (EDS6) |
Inert – Training |
For up to 6 people |
FLT-FLT-EDS-6-S-T |
First Line Technology Enhanced Decon Systems (EDS12) |
Active |
For up to 12 people |
FLT-FLT-EDS-12-S |
First Line Technology Enhanced Decon Systems (EDS12) |
Inert – Training |
For up to 12 people |
FLT-FLT-EDS-12-S-T |
First Line Technology Enhanced Decon Systems (EDS24) |
Active |
For up to 24 people |
FLT-FLT-EDS-24-S |
First Line Technology Enhanced Decon Systems (EDS24) |
Inert – Training |
For up to 24 people |
FLT-FLT-EDS-24-S-T |
Replenishment Packs
Name of Product |
Formula |
Serves # of People |
Item # |
First Line Technology Enhanced Decon Systems (EDS6) Replenishment Pack |
Active |
For up to 6 people |
FLT-FLT-EDS-RPL-6 |
First Line Technology Enhanced Decon Systems (EDS6) Replenishment Pack |
Inert – Training |
For up to 6 people |
FLT-FLT-EDS-RPL-6-T |
First Line Technology Enhanced Decon Systems (EDS12) Replenishment Pack |
Active |
For up to 12 people |
FLT-FLT-EDS-RPL-12 |
First Line Technology Enhanced Decon Systems (EDS12) Replenishment Pack |
Inert – Training |
For up to 12 people |
FLT-FLT-EDS-RPL-12-T |
First Line Technology Enhanced Decon Systems (EDS24) Replenishment Pack |
Active |
For up to 24 people |
FLT-FLT-EDS-RPL-24 |
First Line Technology Enhanced Decon Systems (EDS24) Replenishment Pack |
Inert – Training |
For up to 24 people |
FLT-FLT-EDS-RPL-24-T |
Dahlgren Decon is licensed from Department of the Navy under U.S. Patent Nos. 7,064,241, 7,718,594, and 7,829,520